Turnkey home and villa renovation in Istanbul: what drives the cost in 2026?

· 2 min read · SG Concept Architecture

Turnkey home and villa renovation in Istanbul: what drives the cost in 2026?

"How much does renovation cost per square metre?" is one of the most common questions. But the right question is: what will be done in that square metre? There is a huge difference between renewing paint and floors and redoing the services, wet areas and cabinets from scratch.

Why do renovation prices vary so much?

For example, real requests shared on Armut's 2026 turnkey renovation page show a range of 60,000 TRY to 500,000 TRY for a 100 m² Istanbul apartment; the platform's overall range runs from 11,110 TRY to 2,500,000 TRY. The gap comes from the same floor area corresponding to very different work.

The main items in the budget

  • Strip-out and structural work: demolition, rubble, wall changes
  • Services: electrical, water, natural gas, climate control
  • Wet areas: bathroom and kitchen, waterproofing
  • Floors, walls and ceilings: plaster, paint, parquet, tiles, suspended ceilings
  • Windows and doors
  • Custom furniture, cabinets and worktops
  • Lighting, fixtures and sanitaryware
  • Design, site management and cleaning
Bedroom with a forest view after renovation
Bedroom with a forest view after renovation

What is different in a villa?

Villas have several floors, stairs, garden and terrace connections, larger wet areas and often central climate control. In villas in Göktürk and Kemerburgaz the site management plan also matters: changes to facades, windows and outdoor areas may need the management's approval.

Work that needs a permit

Work that touches the structural system, or changes the facade or the building's use, may require municipal permission. Always have a structural expert check before removing a wall. Interior work such as paint, flooring and furniture renewal usually needs no permit.

How to set a realistic budget

  • First a list of needs and a design
  • Then quantities: how much of each type of work
  • At least two or three quotes on the same quantities
  • 10 to 15 per cent of the total for unexpected work
  • Early orders for materials with long lead times
“Most renovations that go over budget start not on site, but with an incomplete design.”

Getting the whole process from concept design to build from one team reduces the gap between design and site, and budget surprises. Let's define the scope for your villa or apartment together.

Frequently asked questions

What does turnkey renovation mean?

All work, from design to final cleaning, is managed by one company and handed over to you ready to use.

How long does renovating a 100 m² apartment take?

It depends on scope. Paint and flooring alone can be done in a few weeks; a full renovation including services, bathroom, kitchen and custom furniture can take several months.

Do I need a municipal permit to renovate in Istanbul?

Work that touches the structure, the facade or the building's use may need a permit. Most interior renovations do not; however, villas in gated communities may require management approval.

How much should I set aside for unexpected costs?

We recommend 10 to 15 per cent of the total budget. In older buildings this can be higher.